HomeProBadgeHomeProBadge
Official Violation Notice Received?

Unpermitted Work Notice in Martin County?
Act Before Your Deadline Passes.

Opening a permit violation notice is stressful. We break down the Martin County process so you know exactly what's expected and when.

Act within 30 days — or fines begin stacking up.

Or browse the free guide below first

AI-powered. County-specific. Delivered in minutes. 100% confidential.

Most Martin County Permit Violations Are Resolved Without Lawyers or Court

Imagine this: you're going through the mail on a Tuesday. Mixed in with the utility bills and credit card offers is a letter from the Martin County Building Department. Your stomach drops. What did I do wrong?

The letter references a room addition. Or an electrical panel. Or the deck you built five years ago — or that the previous owners built before you ever moved in. The work was done. Life moved on. But the permit was never pulled. And now the county knows.

This is one of the most common situations we help homeowners navigate. Unpermitted work is everywhere in Florida — estimates suggest 20–30% of all home improvement work is done without proper permits. The county can't catch everything in real time, but when they do find it, they have to act.

The good news: you're not in uncharted territory. The path through this is well-worn in Martin County. We'll show you exactly where to walk.

Martin County Violation Notices: What the County Is Actually Asking For

A permit violation notice from Martin County is the county's formal documentation that unpermitted work was found on your property. Florida Statute 553 gives the county authority to require all construction to be permitted and inspected. In Martin County, that authority runs through the Martin County Building Department.

Common Violations in Martin County

  • Unpermitted room additions and enclosures
  • Unpermitted electrical work and panel upgrades
  • Unpermitted plumbing alterations and fixture relocations
  • Unpermitted structural changes and load-bearing wall removal
  • Unpermitted HVAC system installations and replacements
  • Garage conversions without permits
  • Deck and porch construction without permits
  • Fence installations without permits
  • Pool installations without required permits
  • Roofing work exceeding exemption thresholds

The 30-Day Myth

Many homeowners believe they have 30 days to "fix" the problem. The truth is more nuanced: you typically have 30 days to respond — meaning you need to initiate the permit process or contact the building department, not complete all the work. However, fines and penalties can begin accruing from the date of the notice. Acting in the first 48 hours is always better than waiting.

3 Steps to Clear Your Martin County Permit Violation

1

Upload Your Notice

Upload your violation letter or describe the situation. Our AI reads the notice and identifies exactly what the county is citing.

2

Get Your Plan

We generate a Martin County-specific action plan: which department to call, what to say, which forms to file, and who to hire.

3

Take Action

Follow your step-by-step plan with direct links to the county portal, pre-filled forms, and vetted local professionals.

Free

Instant delivery. County-specific. No cost ever.

  • County-specific action plan (not generic advice)
  • Direct link to your county permit portal
  • Martin Building Dept contact info + best time to call
  • Which forms you need to file
  • What to say when you contact the inspector
  • Estimated permit fees and timeline
  • List of licensed professionals who can help
  • Owner-builder eligibility analysis
  • Penalty avoidance strategies
  • No signup required — completely free
100% Free
Instant Delivery
Free Account Required
HTTPS Encrypted

Martin County Building Department — Direct Links

Martin County Building Department

Official WebsiteOnline Permit Portal(Accela)(772) 288-5916
900 SE Ruhnke Street, Stuart, FL 34994
Monday-Friday 7:00 AM - 4:30 PM (Phone), 7:00 AM - 4:00 PM (Lobby)

After-the-Fact Permit Process

Martin County allows retroactive (after-the-fact) permits for unpermitted work. The process involves: 1) Contact the Building Department at (772) 288-5916 to explain the situation and get guidance; 2) Hire a certified inspector or contractor to assess the work and ensure it meets current Florida Building Code standards; 3) Gather all relevant documentation including photos, blueprints, and any previous permits; 4) Apply through the Accela Citizen Access portal for a retroactive permit; 5) Submit complete plans and documentation showing the work complies with code; 6) Pay applicable permit fees plus potential penalty fees; 7) Schedule inspections - work may need to be uncovered if concealed behind walls or finishes; 8) Address any code violations found during inspection; 9) Pass all required inspections to obtain final approval. Owner-builders must appear in person at 900 SE Ruhnke Street to sign the Owner/Builder Disclosure Statement. The county's Code Enforcement Division investigates complaints within 5 business days and works to gain voluntary compliance before formal enforcement.

Owner-Builder Eligible

Yes — Homeowners Can Pull Their Own Permits

Site Plan Required

Yes

Typical Permit Timeline

42 days

Penalty Range

$250-$5,000 per day (standard violations), up to $15,000 for irreparable/irreversible violations

State Statute Reference

F.S. 553.79, F.S. 553.80, F.S. 489.103, F.S. 489.127, F.S. 162.09, F.S. 162.21

Data last verified: April 13, 2026

Martin County Professionals Who Specialize in Permit Violations

Connect with licensed engineers, surveyors, and contractors who specialize in permit legalization in your area.

Licensed Structural Engineers (P.E.)

A licensed P.E. is often required to certify after-the-fact work, especially for structural modifications.

H

Hunter Engineering Group

Stuart, FL

Insured
W

Wood Structural Engineering

Stuart, FL

Insured
P

Premier Structural Group

Stuart, FL

Insured4.7

Licensed Home Inspectors & Surveyors

An inspection report is often needed to document existing conditions for the permit application.

S

Sunrise Building Inspections

Stuart, FL

Insured
H

Heritage Building Inspections

Hobe Sound, FL

V

V&K Property Inspections

Stuart, FL

Licensed General Contractors & Inspectors

An experienced contractor familiar with the county can navigate the permit process and coordinate all repairs.

N

Nunez Construction

Palm City, FL

R

Ruiz Contracting

Jensen Beach, FL

P

Premier Builders

Hobe Sound, FL

MartinCounty — Code & Permit Reference

Official requirements sourced directly from Martin County building codes and local ordinances.

1

Submit complete packages the first time through Accela - incomplete submissions cause the most delays according to local permit experts

building-department.org

2

Schedule inspections early in the morning for better availability and check the portal after 7:30 AM on inspection day for inspector assignment

building-department.org

3

Call (772) 288-5916 early morning for fastest customer service response

building-department.org

4

Code Enforcement hearings are typically held on the third Wednesday of the month at 9 AM

martin.fl.us

5

Martin County Code Enforcement seeks voluntary compliance first before formal enforcement actions - cooperation can reduce penalties

martin.fl.us

6

Notice of Commencement must be recorded before the first inspection for most projects over $5,000

building-department.org

7

Plan review typically takes 10 to 21 days depending on project type and complexity

permitplace.com

8

Owner-builders must appear in person at the Building Department to sign the Owner/Builder Disclosure - this cannot be done online

martin.fl.us

Disclaimer: Code references are gathered from public county sources and may not reflect recent amendments. Always verify current requirements directly with Martin County Building Department before taking action.

What the Next 7 Weeks Look Like: Martin County Permit Resolution

Our permit legalization tracker takes you from violation notice to final sign-off.

Week 1

Violation Response

Respond to the county notice in writing. Begin document gathering.

Week 2

Professional Engagement

Hire engineer/contractor. Order any required reports or surveys.

Week 3

Permit Application

Submit after-the-fact permit application with required drawings and reports.

Week 4-5

County Review

County reviews application. Respond to any correction requests (RFIs).

Week 6

Permit Approved

Permit issued. Schedule required inspections.

Week 7

Inspections & Close-Out

Pass final inspections. Receive certificate of completion.

Final

Violation Cleared

County closes the violation. Your property record is clean.

Frequently Asked Questions

What's the very first call I should make after receiving a Martin County permit violation?
Call the Martin County Building Department at (772) 288-5916. Introduce yourself, provide the violation notice number, and ask: (1) What is the exact nature of the violation? (2) What does a compliant response look like? (3) Is a pre-application meeting available? Document everything in writing.
Is it possible to get a permit violation dismissed in Martin County?
In rare cases — if the work was actually permitted but county records are incomplete, or if the violation was issued in error — you can request an administrative review. In most cases, however, the path forward is compliance through after-the-fact permitting, not dismissal.
What's the difference between a code violation and a permit violation in Martin County?
A permit violation specifically means work was done without obtaining the required permits. A code violation is broader — it can include permit issues but also habitability, safety hazards, or ordinance violations. Permit violations are almost always resolved through the after-the-fact permit process. Other code violations may require different remediation.
My home inspection didn't catch this. Can I hold the inspector liable?
Home inspectors in Florida are not required to research permit histories — their scope is limited to visible, accessible conditions at the time of inspection. If your contract included a specific permit search, you may have a claim. But in most cases, permit history research is the buyer's (or their attorney's) separate responsibility before closing.
What documentation will Martin County require for an after-the-fact permit?
Requirements vary by scope but typically include: a completed permit application, as-built drawings (stamped by a licensed engineer or architect for structural work), photos of the existing work, contractor license information, and payment of permit fees. Your free Action Plan details the exact requirements for Martin County.
How do I know if previous owners did unpermitted work in Martin County?
You can request a permit history search from the Martin County Building Department or check the county's online permit portal. The county property record will show all permitted improvements. Any additions or improvements not reflected in the permit history are potentially unpermitted.
Can I negotiate the fines for my Martin County permit violation?
In some cases, yes. County code enforcement boards often have discretion to reduce fines, especially for first-time violations where the homeowner demonstrates good-faith compliance efforts. Hiring a local contractor experienced with Martin County and acting quickly is the strongest argument for fine reduction.

Act Now Before Fines Start Stacking Up.

Most Martin County permit violations are resolved within 6–8 weeks when homeowners act immediately. Don't let yours drag on.

AI-powered. County-specific. Delivered in minutes. 100% confidential.

Legal Disclaimer

HomeProBadge is not a law firm and does not provide legal advice. The information, guidance, and action plans provided on this site are generated for general informational purposes only and do not constitute legal advice, legal opinions, or attorney-client relationships of any kind.

The action plans are created using publicly available building code data and artificial intelligence analysis. They may not reflect the most current local ordinances, zoning regulations, or county-specific requirements. Always verify all requirements and deadlines directly with your county's building department, planning department, and/or zoning office before taking action.

For legal advice specific to your situation — including permit appeals, fines, liens, or code enforcement actions — please consult a licensed attorney in your jurisdiction.

Use of this service constitutes acceptance of our Terms of Service and Privacy Policy. ScreenForge Labs LLC is not affiliated with Martin County or any government agency.